Consultants: M/s. Federal Engineering Consultants
Client: Deepak Jagjivan, Joseph Thomas & Kirti Dnakan
Project Status: Ongoing
Main-Contractor: Gulf Asia Contracting LLC
Scope of work: Complete MEP Works
G+3P+16 Story Residential Building at Plot No. JVC12PHRS003, Jumeirah Village Community (JVC), Dubai
Project Brief Summary
- Ground + 3 Podium + 16 Floors + Roof - Residential & Commercial
- Total Built-Up Area = 265,239.40 sq ft.
- Project Completion = 19 Months
- Defect Liability Period = 12 Months
- Total no. of Apartment = 166nos.
-
Studio Unit = 30nos.
Bedroom Unit = 88nos.
Bedroom Unit = 48nos.
- District Cooling AC System = 705.54 Total TR
- LV Panel = 1no. 1899.44 KW TCL
- Standby Generator = 1no. 400KVA
- Busbar Riser = 1no. (1600A TPN+E)
- ·ELV System
-
Structured Cabling System
CCTV System
Access Control System
Lighting Control System
Video Intercom System
BGM System
Gate Barrier
Building Management System
LPG System
Fire Protection System
Fire Fighting S0ystem (Fire Pump = 750GPM @ 16.00 Bar)
Fire Alarm and Voice Evacuation System
Central Monitoring System