Consultants: M/s Gulf Engineering and Consultant
Client: M/s Ellington Properties Development LLC
Project Status: Ongoing
Main Contractor : M/s AROMA INTERNATIONAL BUILDING CONTRACTING LLC
Scope of work: Complete MEP Works
B+G+P+29+Mechanical Floor+R Residential Building on Plot No. 3479482, Al Merkadh, Sobha Hartland,Dubai - UAE
Project Brief Summary
- · Water Tank + Ground + 1 Podium + 29 Floors + Mech + Roof - Residential Building
- Total Built-Up Area = 673,311.33 sq ft.
- Project Completion = 24 Months
- Defect Liability Period = 12 Months
- Total no. of Apartment = 342nos.
Studio Unit = 18nos. 3-Bedroom Duplex Unit = 1no
1-Bedroom Unit = 137nos. 4-Bedroom Unit = 5nos.
2-Bedroom Unit = 155nos. 4-Bedroom Duplex Unit = 2nos.
3-Bedroom Unit = 23nos. Penthouse Unit = 1no. - VRF AC System = 1464.68 Total TR
- LV Panel = 5nos. 6740.64 KW TCL
- Standby Generator = 1no. 800KVA
- Busbar Riser = 4nos. (2nos. 2500A + 2nos. 2000A TPN+E)
- Lighting Control System
- ELV System – PS Item (Containment only included)
Structured Cabling System
CCTV System
Access Control System
Lighting Control System
Video Intercom System
BGM System
Gate Barrier
AV System
Home Automation System - Building Management System
- LPG System (500 Galloons – 2nos.)
- Aircraft Warning Lights – 2nos.
- Fire Protection System
Fire Fighting System (Fire Pump = 1000GPM @ 17.00 Bar + 750GPM @ 12.00 Bar)
Fire Alarm and Voice Evacuation System - Central Battery System