The Highbury

The Highbury

Consultants: M/s Gulf Engineering and Consultant
Client: M/s Ellington Properties Development LLC
Project Status: Ongoing
Main Contractor : M/s AROMA INTERNATIONAL BUILDING CONTRACTING LLC
Scope of work: Complete MEP Works

B+G+P+29+Mechanical Floor+R Residential Building on Plot No. 3479482, Al Merkadh, Sobha Hartland,Dubai - UAE

Project Brief Summary

  • · Water Tank + Ground + 1 Podium + 29 Floors + Mech + Roof - Residential Building
  • Total Built-Up Area = 673,311.33 sq ft.
  • Project Completion = 24 Months
  • Defect Liability Period = 12 Months
  • Total no. of Apartment = 342nos.
    Studio Unit = 18nos. 3-Bedroom Duplex Unit = 1no
    1-Bedroom Unit = 137nos. 4-Bedroom Unit = 5nos.
    2-Bedroom Unit = 155nos. 4-Bedroom Duplex Unit = 2nos.
    3-Bedroom Unit = 23nos. Penthouse Unit = 1no.
  • VRF AC System = 1464.68 Total TR
  • LV Panel = 5nos. 6740.64 KW TCL
  • Standby Generator = 1no. 800KVA
  • Busbar Riser = 4nos. (2nos. 2500A + 2nos. 2000A TPN+E)
  • Lighting Control System
  • ELV System – PS Item (Containment only included)
    Structured Cabling System
    CCTV System
    Access Control System
    Lighting Control System
    Video Intercom System
    BGM System
    Gate Barrier
    AV System
    Home Automation System
  • Building Management System
  • LPG System (500 Galloons – 2nos.)
  • Aircraft Warning Lights – 2nos.
  • Fire Protection System
    Fire Fighting System (Fire Pump = 1000GPM @ 17.00 Bar + 750GPM @ 12.00 Bar)
    Fire Alarm and Voice Evacuation System
  • Central Battery System